2 Hour Floor System Detail

Image Result For 2 Hour Fire Rated Floor Ceiling Assembly Stud Walls Wood Studs Floor Ceiling

Image Result For 2 Hour Fire Rated Floor Ceiling Assembly Stud Walls Wood Studs Floor Ceiling

Pin By Rion Philbin On Bs Exterior Wall Cladding Wall Cladding Floor Ceiling

Pin By Rion Philbin On Bs Exterior Wall Cladding Wall Cladding Floor Ceiling

1 Hour Assembly Illustration Roof Covering Roof Construction

1 Hour Assembly Illustration Roof Covering Roof Construction

Pin On Aa

Pin On Aa

Best 25 Precast Concrete Slabs Ideas On Plunge Pool Precast Concrete Concrete Slab Precast Concrete Slabs

Best 25 Precast Concrete Slabs Ideas On Plunge Pool Precast Concrete Concrete Slab Precast Concrete Slabs

1 Hour Rated Fire Wall Google Search Roof Work Rigid Insulation Brick Paneling

1 Hour Rated Fire Wall Google Search Roof Work Rigid Insulation Brick Paneling

1 Hour Rated Fire Wall Google Search Roof Work Rigid Insulation Brick Paneling

D925 unres nwc all.

2 hour floor system detail. Cfs sp wb water based acrylic sealant spray mineral wool show all. D985 res 4 1 2 nwc mk6gf. Ul n501 two layers of 5 8 15 9 mm fire shield wallboard applied to beam cage fabricated from. Phes2 fire rated floor seal 2 hour rated pick resistant 50 movement 100 total 1 2 to 4 systems ul listed pecora tru white or limestone.

The way a sleeve is packed and sealed are directly proportional to the amount of time a system will suppress a fire. For example a 1 inch thickness of intumescent putty may be sufficient for a 1 or 2 hour rated penetration but a 3 or 4 hour application might require a 2 or more inch thickness in the ends of a sleeve system. Gypsum wall to concrete over fluted metal deck with structural steel beams or bar joists penetrating wall top of wall max. These listings are short summaries to serve as a.

Assembly hr description ul cad drawings. Table 3 one hour fire rated wood floor ceiling assemblies. L571 l589 m 502 warnock hersey j20050694. 2 hour fire rated security deck compression seal.

9 1 4 1 1 2 mineral wool batts 2 5 pcf nominal resting on hat. 2 hour metablock is a versatile intumescent and foam fire barrier for horizontal floor expansion joints with simple installation splicing and transitioning skip to navigation skip to content 800 767 0082. W insulation resilient channel. I joists 24 o c.

1 2 12 7 mm plywood floor. D925 unres nwc z106hy. D925 unres nwc mk6gf. Achieving a 2 hour floor ceiling assembly from the underside only home articles achieving a 2 hour floor ceiling assembly from the underside only one of our current projects is a change of occupancy where the change will require a 2 hour rating between the main level a 2 occupancy and the r 2 occupancy above.

4 1 2 nwc 2hr only fluted. 6 usg fire resistant assemblies test certification test conditions and fire and sound tested assemblies listed in this selector are based on characteristics properties and performance certificationof materials and systems obtained under controlled test conditions as set forth in the appropriate astm standard in effect at the time of test. Ceiling provides one hour fire resistance protection for wood framing. D985 res 4 1 2 nwc z106hy unprotected future floor ceiling nwc fluted cellular ul d925.

Gypsum wallboard beam fireproofing 8wf24 or heavier cad file name goldn dwg or goldn dxf no. D985 unres 4 1 2 nwc all. D985 unres 4 1 2 nwc mk6g.

Buildings Type I Or Ii Construction Require Minimum Fire Resistive Rating Of 2 Hours For Stair Enclosures Building Systems Fire Construction

Buildings Type I Or Ii Construction Require Minimum Fire Resistive Rating Of 2 Hours For Stair Enclosures Building Systems Fire Construction

Exterior Frameless Glass Wall Systems Detail Google Search Glass Wall Systems Wall Systems Gypsum Wall

Exterior Frameless Glass Wall Systems Detail Google Search Glass Wall Systems Wall Systems Gypsum Wall

Exterior 1 Hour Fire Rated Wall Google Search Treated Plywood Wood Studs Gypsum Wallboard

Exterior 1 Hour Fire Rated Wall Google Search Treated Plywood Wood Studs Gypsum Wallboard

Multi Story Wood Construction Sponsored By Woodworks And Rethink Wood Originally Published In The March 26 201 Wood Construction Home Addition Wood Floors

Multi Story Wood Construction Sponsored By Woodworks And Rethink Wood Originally Published In The March 26 201 Wood Construction Home Addition Wood Floors

Pin By Grzegorz Salapa On Techniczne Wood Truss Plates On Wall Wall Board

Pin By Grzegorz Salapa On Techniczne Wood Truss Plates On Wall Wall Board

Pin On Conrect

Pin On Conrect

Fire Rated Door Glazing Must Be 1 4 Min Thickness And Wire Glass Or Ceramic Glazing 1 1 2 Hr Door Exterio Fire Rated Doors Building Systems Building Design

Fire Rated Door Glazing Must Be 1 4 Min Thickness And Wire Glass Or Ceramic Glazing 1 1 2 Hr Door Exterio Fire Rated Doors Building Systems Building Design

One Hour Rated Wall 5 1 2 Thickness 16 O C Metal Studs

One Hour Rated Wall 5 1 2 Thickness 16 O C Metal Studs

Floor Ceiling Steel Framed 1 1 2 Hour Ul G502 3d Warehouse 3d Warehouse

Floor Ceiling Steel Framed 1 1 2 Hour Ul G502 3d Warehouse 3d Warehouse

Tanzakademie 2014 Stair Plan Egress Building Code

Tanzakademie 2014 Stair Plan Egress Building Code

Image Result For Precast Concrete Roof Detail Concrete Roof Precast Concrete Roof Structure

Image Result For Precast Concrete Roof Detail Concrete Roof Precast Concrete Roof Structure

05b Proposed Ground Floor Plan Jpg 1285 756 Ground Floor Plan Floor Plans Ground Floor

05b Proposed Ground Floor Plan Jpg 1285 756 Ground Floor Plan Floor Plans Ground Floor

Image Result For Interior Metal Stud Partition Connection To Roof Structure Roof Structure Roof Roofing

Image Result For Interior Metal Stud Partition Connection To Roof Structure Roof Structure Roof Roofing

Pin On Indoor Shooting Ranges

Pin On Indoor Shooting Ranges

Buildings Of Type Iii And Type V Construction That Are Below 5 Stories Are Required To Have Exit Stairs With 1 Hour Building Systems Wall Board Lectures Notes

Buildings Of Type Iii And Type V Construction That Are Below 5 Stories Are Required To Have Exit Stairs With 1 Hour Building Systems Wall Board Lectures Notes

2 Hour Fire Rated Wall Thickness For Concrete Google Search Precast Concrete Concrete Wall Concrete

2 Hour Fire Rated Wall Thickness For Concrete Google Search Precast Concrete Concrete Wall Concrete

Pin By Superior Walls Of East Tenness On Lake House Construction Details Superior Walls Icf Foundation Finishing Basement

Pin By Superior Walls Of East Tenness On Lake House Construction Details Superior Walls Icf Foundation Finishing Basement

Equivalent Thickness Used To Determine Fire Resistance Since Cmu Is Usually Hollow The Actual Thickness Of Solid Material Not The Ove The Unit Cmu Material

Equivalent Thickness Used To Determine Fire Resistance Since Cmu Is Usually Hollow The Actual Thickness Of Solid Material Not The Ove The Unit Cmu Material

Https Encrypted Tbn0 Gstatic Com Images Q Tbn 3aand9gcswmnx2 2 5gps Skbd0 Vxl0wbxmbhl097mxixn2qyyzey Pxm Usqp Cau

Https Encrypted Tbn0 Gstatic Com Images Q Tbn 3aand9gcswmnx2 2 5gps Skbd0 Vxl0wbxmbhl097mxixn2qyyzey Pxm Usqp Cau

Emshield Wfr2 Is A Watertight Ul 2079 2 Hr Fire Rated Wall Expansion Joint Seal For Both New And Retrofit Structural Expansio Expansion Joint The Expanse Fire

Emshield Wfr2 Is A Watertight Ul 2079 2 Hr Fire Rated Wall Expansion Joint Seal For Both New And Retrofit Structural Expansio Expansion Joint The Expanse Fire

House Piping System Home Construction Plumbing Home

House Piping System Home Construction Plumbing Home

Fusible Link Louver Listed Fusible Link Type Louvers To A Maximum Size Of 24 X 24 Are Permitted In 1 1 2 Hour And 3 4 Hou Fire Doors Glass Lighting Mounting

Fusible Link Louver Listed Fusible Link Type Louvers To A Maximum Size Of 24 X 24 Are Permitted In 1 1 2 Hour And 3 4 Hou Fire Doors Glass Lighting Mounting

Project Solar And Battery Bank Addition For An Rv Rv Happy Hour Rv Solar Power Best Solar Panels Rv Solar

Project Solar And Battery Bank Addition For An Rv Rv Happy Hour Rv Solar Power Best Solar Panels Rv Solar

Jarod Schultz Curtain Wall Wall Systems Curtains

Jarod Schultz Curtain Wall Wall Systems Curtains

Organicites Piraeus Tower Haus Dekor Wohnideen C C

Organicites Piraeus Tower Haus Dekor Wohnideen C C

Assembly 2 Steel Framed Wall With Anchored Masonry Veneer Masonry Veneer

Assembly 2 Steel Framed Wall With Anchored Masonry Veneer Masonry Veneer

Fire Rated Installation Detail

Fire Rated Installation Detail

Christo Steel Riser Door Fr120 Door Design Modern Access Panels Modern Buildings

Christo Steel Riser Door Fr120 Door Design Modern Access Panels Modern Buildings

Fire Resistant Glass System Freframes Clearfloor System 60 90 120 Minute Fire Rated Safety Rated Glass Floor System This A Glass Floor Flooring Glass Panels

Fire Resistant Glass System Freframes Clearfloor System 60 90 120 Minute Fire Rated Safety Rated Glass Floor System This A Glass Floor Flooring Glass Panels

Expansion Joints Detail Google Search Expansion Joint The Expanse General Construction

Expansion Joints Detail Google Search Expansion Joint The Expanse General Construction

Pin On Plaza Deck Expansion Joints

Pin On Plaza Deck Expansion Joints

42 Crosby Street Residence 2n Cast Iron Architecture Floor Plans Architecture

42 Crosby Street Residence 2n Cast Iron Architecture Floor Plans Architecture

Exterior Wall Assembly In Specification Exterior Insulation Metal Siding Cavity Insulation

Exterior Wall Assembly In Specification Exterior Insulation Metal Siding Cavity Insulation

Workshop Planning Checklist Unique Training Checklist Templates Find Word Templates Inspection Checklist Checklist Template Planning Checklist

Workshop Planning Checklist Unique Training Checklist Templates Find Word Templates Inspection Checklist Checklist Template Planning Checklist

A Technical Floor Plan For A Conceptual Museum Space Junior Year Interior Design Degree How To Plan Student Work

A Technical Floor Plan For A Conceptual Museum Space Junior Year Interior Design Degree How To Plan Student Work

Drifast Color Samples Floor Stain Colors Hardwood Floor Stain Colors Concrete Stained Floors

Drifast Color Samples Floor Stain Colors Hardwood Floor Stain Colors Concrete Stained Floors

Related Image Residential Skylights Roof Lantern Large Homes

Related Image Residential Skylights Roof Lantern Large Homes

What Does A 2 Hour Consult Look Like Kitchen Layout Ikea Cabinets Floor Plans

What Does A 2 Hour Consult Look Like Kitchen Layout Ikea Cabinets Floor Plans

212 West 18th St Penthouse1 New York Ny 10011 Home Building Design Condo Floor Plans Modern Floor Plans

212 West 18th St Penthouse1 New York Ny 10011 Home Building Design Condo Floor Plans Modern Floor Plans

Complete Technical Drawing Set For A Fictitious Museum Space Floor Plan Reflected Ceiling Plan Interior Design Drawings Drawing Interior Technical Drawing

Complete Technical Drawing Set For A Fictitious Museum Space Floor Plan Reflected Ceiling Plan Interior Design Drawings Drawing Interior Technical Drawing

Fire Rated Doors Google Search Fire Doors Steel Doors Fire Rated Doors

Fire Rated Doors Google Search Fire Doors Steel Doors Fire Rated Doors

Steco Centar Montazne Kuce I Drvene Brvnare Bih Srb Hr Floor Plans

Steco Centar Montazne Kuce I Drvene Brvnare Bih Srb Hr Floor Plans

Watertight 2 Hour Ul2079 Fire Rated Expansion Joint System For Floors And Decks In Construction And Building Applications Expansion Joint The Expanse Flooring

Watertight 2 Hour Ul2079 Fire Rated Expansion Joint System For Floors And Decks In Construction And Building Applications Expansion Joint The Expanse Flooring

3

3

Source : pinterest.com